Pinellas Bayway Structure C

Client

FDOT

Location

Pinellas County, FL

Structure

Prestressed concrete I-girder bridge

Category

design, construction

Date

2013

Services provided

  • Bridge plans review
  • Shop drawings review
  • Construction issues resolution

We reviewed the entire structures plans and help resolving complex construction issues. A 4-lane high level fixed bridge over water which replace a 2-lane bascule bridge that was built in 1962, $41 million project. The total bridge length is over 2,600 ft with span length ranging from 136.5 ft to 173 ft. Superstructures are FIBs. The bridge was constructed in two phases. There are 34 piers in the deep water.