Bridge over Big Marco Pass along SR 951

Client

FDOT

Location

Collier County, FL

Structure

Prestressed concrete bridge

Category

design

Date

2005-2006

Services provided

  • Bridge plans review
  • Design calculations

This is a 10-span prestressed concrete bridge with maximum span length of 160 feet. It had a total length of roughly 1,600 feet. We reviewed the bridge plans and bridge design calculations, including deck, beams, substructures.

Other Projects

Have a project in mind?

Let's get to work