I-75 Widening Fowler Ave. to Bruce B. Downs Blvd.

Client

FDOT

Location

Tampa, FL

Structure

Prestressed concrete I-girder bridges

Category

design, construction

Date

2010-2012

Services provided

  • Bridge development review
  • Bridge plans review
  • Construction review

We were responsible for bridge development, entire bridge plans review, and construction review. There are 10 concrete girder bridges with span length ranging from 58 to 87 ft to be widened. Used modified AASHTO beams which not only ensured the widened bridges' aesthetic beauty, but also provided the most cost-effective alternative.